Charlotte Concrete Services handles residential and commercial concrete in Cornelius: driveway replacements, walks and steps, patios, slab leveling, retaining walls and flatwork, priced in writing.
Cornelius is a Mecklenburg County town of 31,412 people as of the 2020 census, founded in 1893 around a cotton mill and incorporated in 1905. It grew from under 2,600 residents in 1990 to 24,866 by 2010, so an old mill village sits beside lakefront and newer subdivisions.
We work from Old Town out West Catawba Avenue to the Lake Norman peninsulas, and also pour in Concord.

Get a FREE Quote
The street owner decides who reviews it.
The Town of Cornelius Planning Department reviews zoning and connections to town streets.
Permits for walls, footings and structural slabs come from Mecklenburg County Code Enforcement; we prepare the submittal.
A driveway onto NC 115 or US 21 needs an NCDOT permit, so we start early.
Mill houses along Main Street are the oldest part of town.
We prepare the drawing and finish description the town asks for.
Front steps on these narrow lots crack and pull from the porch. We rebuild them on footings and tie in new concrete sidewalks and walkways.
West-side lots fall toward the lake over Piedmont red clay.
On steep lots we thicken edges, add reinforcement and cut a deep broom finish. A replaced 600-square-foot driveway runs about $6,000-$9,600 at $10-$16 per square foot; grade work adds $1-$3 per square foot.
Cross-slope sends water to the street, with a trench drain at the bottom when needed.
Clay that softens when wet leaves gaps under older slabs. A slab that dropped in one piece can be raised with concrete leveling; a broken one needs replacement.
Retail at Exit 28 and offices on West Catawba Avenue need durable concrete.
Clinics and offices need level, accessible walks and curb ramps, phased to keep entrances open.
Shopping centers wear out dumpster pads and drive lanes first. Commercial parking lots and driveways are quoted from plans or a site visit.
Marinas and suppliers along US 21 need pads sized for forklifts, trailers and loaded roll-offs.
Common questions.
We look up the parcel and street owner.
Close, with texture, joint layout and edge detail. We show a sample.
Foot traffic after a day or two, furniture after a week; curing continues for 28 days.
Not below an expected 40°F; we wait out cold snaps.