Charlotte Concrete Services rebuilds walks and steps, replaces narrow driveways, pours patios and fixes settled slabs in Mooresville, plus flatwork for race shops.
Mooresville is the largest town in Iredell County, up from 18,823 residents in 2000 to 50,193 at the 2020 census. Mill-era houses near Main Street sit on concrete settled for a century, while Lake Norman subdivisions west of I-77 were poured fast during the boom.
We work downtown, along NC 150 and in the lake neighborhoods off Brawley School Road. Southeast on US 74, we also serve Indian Trail.

Get a FREE Quote
The streets near Main Street grew up with the cotton mills after 1900.
Mill-house steps tilt and crumble after decades on red clay, so we rebuild them on proper footings with even risers.
Single-lane driveways squeezed between houses mean hand work. New concrete runs $8-$14 per square foot; removal adds $2-$6.
Our concrete sidewalks and walkways line up with the town sidewalk and slope away from the house.
The Town of Mooresville has run its own Building Permitting and Inspections Department since 2023.
Footings and retaining walls get reviewed under the NC Residential Code; we confirm what your job needs before quoting.
NC 150, NC 115 and US 21 are NCDOT routes, so a new driveway onto one needs an NCDOT driveway permit.
Most lake neighborhoods have HOA rules on driveway width and finish. We check them first.
We call inspections at the right stage and leave forms open until the inspector signs off.
Lake Norman sits 3 to 8 miles west of downtown, and most of the town drains toward it.
Cove lots slope hard toward the water, so we study runoff before setting the pitch of a patio or driveway.
Red clay holds water and softens when wet, so we size slabs to what you use and can pair a concrete patio with a gravel edge or drain.
More than 60 NASCAR teams and the Lowe's headquarters keep commercial streets busy.
We plan where a ready-mix truck can stand on a narrow cove road and pump when it cannot reach.
Shop floors and entry walks are quoted from plans or a site walk under our commercial slabs and floors work.
What homeowners ask us most.
Often, if the apron touches a state or town right-of-way. We handle it.
Usually, by bridging roots with reinforcement or shifting the walk.
Foot traffic the next day; a week before heavy loads; curing continues 28 days.